Scroll to discover
Betime Engineering
Specialist Contractor in Soil Investigation and
Geotechnical Instrumentation Works. Established
in year 2020.

Stability of Underground Water Table is vital to Singapore Construction Sector. Lowering of water table at the proximity of Shallow Foundation could lead to disaster to building as a result of differential settlement. On the other hand, pressure built up due to excavation could possibly lead to instability of temporary structure and hinder the progress of construction.

Installing Recharging System and Pumping system are only mitigation process for above challenges. They are part of our services too.

Recharge Well

Relieve Well

Pumping Well

Ground Water Monitoring System

Contact us today with your Geotechnical requirements
and let us help
you.